100 Binney Street

Location: Cambridge, MA
General Contractor: John Moriarty and Associates

Project Description: 100 Binney Street included installation of 65,000 sf of reinforced concrete slurry wall, and braced excavation. The 30' deep cut was performed with two levels of cross lot bracing. In addition to containment and treatment of hazardous waste materials, over 50,000cy soil were processed, and transported to various landfills. Our scope of work also included reconstruction of surrounding city roadways and site work.