Contact Us Welcome Services Recent Projecs Geology of Boston Safety Links President's Message History
 
   
 

Pelham Island Road Over the Sudbury River Bridge

sudburyriver sudburyriver
Cofferdam and Steel Piles
Bridge Foundation
 

Location: Wayland, MA
Owner: MassDOT Highway Division
Project Value: $2,257,233.00
Completion Date: 2013

Project Description:
Work consisted of demolition and reconstruction of the Pelham Island Rd. Bridge over the Sudbury River utilizing a precast BEBO arch bridge with precast spandrel walls and wing walls. As a result of AA Willís VECP which modified the precast arch system and changed the cast in place walls to precast there was a substantial cost and time savings which resulted in the road being opened to traffic 6 months ahead of schedule. Work included: excavation, cofferdam excavation, steel piles, sheet pile cofferdams, approach utilities, bituminous paving, fence & guardrail, wetland restoration along Sudbury River and safety controls & signing as well as dredge excavation of Sudbury River for cofferdam construction. AA Will received a 100% rating on this project.

sudburyriver sudburyriver
Bridge Erection
Utility Bridge and Bridge Backfilling
 

Return to Recent Projects page

 

 

 

 

145 Island Street, Stoughton, MA 02072, 781-341-4800

A.A. Will Corporation is an Equal Opportunity employer