Russia Wharf Development

russia russia
Foundation Work at Different Stages

Location: Boston, MA
Owner: Boston Properties
Construction Manager: John Moriarty and Associates
Project Value: $9,665,246
Completion Date: Spring 2010

Seventy foot deep excavation within slurry wall adjacent to the Fort Point Channel utilizing top down construction techniques for a high rise office building with underground parking garage. Work included the following:
Removal of existing 30 ft deep seawall structure adjacent to the Fort Point Channel.
Installation of 20 ft deep braced excavation, adjacent to Fort Point Channel.
Excavation of 70 ft deep garage structure during high rise construction (Up-Down). This work involves excavating of soils below existing concrete floor slabs, within a reinforced concrete slurry wall cofferdam.
Treatment and disposal of hazardous waste. Included on site stabilization of lead contaminated soils, and subsequent hauling and disposal.
Processing, Recycling, and Transportation of 100,000 cy of excavated soils to various landfills and recycling facilities.
Reconstruction of Congress Street, a 4 lane, including drainage, pavement, and curbing.
Installation of new sewer, water, drain, electric, telephone utilities in public ways.

russia russia russia russia
Difficult Pretrenching Top Down Mining

Return to Recent Projects page

 

 

 

 

 