The Clarendon

image image
Removal of Existing Caissons
Installed LBE Columns

Location: Boston, MA
Owner: Beal Company
Construction Manager: Bovis Lend Lease
Project Value: $6,591,933
Completion Date: 12/1/2009

Excavation within reinforced concrete slurry wall utilizing top down construction techniques for a high rise residential structure with below grade parking structure and associated site work. Work included the following:
• Processing, recycling, and transportation of 100,000 c.y. of excavated soils to various landfills and recycling facilities.
• Excavation of 50 ft deep garage structure during high rise construction (Up-Down). This work involves
the excavation of soils below existing concrete floor slabs, within a slurry wall cofferdam.
• Treatment and disposal of hazardous waste. Includes on site stabilization of lead contaminated soils, and subsequent hauling.
• Installation of new sewer, water, drain, electric, telephone utilities in public ways.

image image
Mining Operations

Return to Recent Projects page

 

 

 

 

 

145 Island Street, Stoughton, MA 02072, 781-341-4800

A.A. Will Corporation is an Equal Opportunity employer

 

Contact Us Welcome Services Recent Projecs Geology of Boston Safety Links President's Message History